Archives: Projects

Weigand Construction projects

Ash Skyline Parking Garage

DSC6056 WEB

The Ash Skyline Plaza project, situated in downtown Fort Wayne, Indiana, began with the demolition of nearly an entire city block, at Wayne and Harrison Street. The first phase of the project included a 468,000sf, 1,077 space, city-owned parking garage. With more activity in the downtown area than ever before, the extra parking was sorely needed.

After the parking garage was finished up, the Ash Brokerage Headquarters was constructed on top of the 4 stories of vehicles, as well as multiple retail storefronts, a YMCA and a Bike Hub on the ground floor facing the street.

Eventually after the construction of the Parking Garage and all that it encompassed, Ash Skyline Plaza was completed with the addition of Skyline Tower on the southwest corner of the block.

MetalX

MetalX Exterior Sign Parking

 
MetalX, an independent scrap metal recycling firm based in Waterloo, IN, chose Weigand Construction to expand its operations with the construction of two new buildings, cumulatively spanning 55,000 square feet, a project impressively completed within a 15 week schedule.

The development, set on a sprawling 70-acre campus, features the company’s corporate headquarters, an auxiliary operations office, and retail space, signifying a major enhancement in MetalX’s infrastructure. This construction initiative has bolstered the facility’s capacity for high-volume scrap processing and handling, emphasizing efficiency and sustainability in its design and operational capabilities.

Scot Industries

DJI 20230710101311 0068 D WEB

 
Founded in 1949, Scot Industries has established itself as a premier manufacturer of specialized steel tube and bar products, essential for hydraulic cylinders in diverse machinery such as lift trucks, oil rigs, and robotics. With a robust presence, headquartered in Lone Star, TX, and employing over 500 associates across 10 manufacturing sites in North America, the company has consistently demonstrated its industry leadership.

To accommodate its expanding operations, Scot Industries embarked on the construction of a new production facility in Auburn, IN. This strategic expansion is designed to significantly enhance Scot Industries’ manufacturing capabilities. The construction of the Auburn facility represents a pivotal development in Scot Industries’ growth, meticulously planned to integrate state-of-the-art manufacturing technologies and optimize production processes. This commitment to innovation and excellence in construction not only supports Scot Industries’ expansion needs but also positions the company to better serve its diverse and growing customer base with increased efficiency and capacity.

Indiana University – Spruce Residence Hall

IU Spruce Hall Exterior Main Entrance Full Bulding

Spruce Hall features a diverse array of room configurations, complemented by readily accessible common areas, student lounges, classrooms, and computer labs. Its exterior, finished in limestone, harmonizes with the predominant architectural vernacular of the IU Bloomington campus, seamlessly blending tradition with modern functionality.

Weigand Construction proudly delivered the 450-bed Spruce Hall, encompassing 150,812 square feet, a project that stands as a testament to sustainable and flexible design. This significant project was recognized with LEED Silver Certification by the U.S. Green Building Council, underscoring its commitment to environmental sustainability, community enhancement, and technological integration.

Purdue Fort Wayne Student Services & Athletic Expansion

Purdue Fort Wayne Student Services Exterior Full Landscape Dusk

The Student Services & Athletic Expansion at Purdue Fort Wayne, formerly IPFW, introduces a 100,000 square-foot practice arena complemented by coach offices, two ballrooms, and versatile spaces for events and lectures. Integrating seamlessly with the campus, it connects directly to the library, student union, and sports complexes, enhancing the student experience by uniting athletic, academic, and social spaces into a cohesive, dynamic environment. This development boosts the institution’s capabilities in hosting events and supporting student activities.

Hillsdale College – Margot V. Biermann Athletic Center

Hillsdale College Track Tennis Interior Full Court Level

Located in rural southern Michigan, the nearly 400-acre Hillsdale campus includes both modern and historic buildings. To improve their athletic facilities, Hillsdale College looked to Weigand Construction to build a multi-purpose facility that could accommodate large events.

The Margot V. Biermann Athletic Center provides space for large campus and community gatherings, concerts, convocations, in addition to its characteristic use for physical activities. Coaches’ offices, an athletic training room and hundreds of square feet of storage area are also included in the 70,000sf facility.

A six-lane oval/nine-lane straightaway indoor track, which meets all standards currently in place to host an NCAA championship-level event, surrounds the facility, with four tennis courts covering the interior.

Lutheran Hospital 5th Floor Expansion

Lutheran Hospital Registration Remodel

 

EXTRA SPACE FOR EXTRA PATIENTS

In 2012, facing constraints with capacity and beds, Lutheran Hospital opened its 5th floor expansion to increase their scope and operational capabilities. With Weigand serving as the construction manager, this $42.3 million dollar job was built with the consideration of privacy for cardiac and intensive care patients staying at the facility. This move helped to not only provide much needed relief for Lutheran’s growing list of patients, but it also gave way to designing a more efficient space that would serve the needs of the hospital for years to come. 
 

THE DETAILS

This 60,000 square foot, vertical project brought some additional accommodation areas, including: 

  • 96 new private rooms. 
  • Three 24-bed medical surgical telemetry units. 
  • One 24-bed cardiac intensive care unit. 
  • Design and layout improvements. 

The innovation to private rooms was a unique one, switching from having multiple patients share rooms during recovery and treatment periods.  

“Healthcare needs have continued to change and grow. People really don’t like [shared rooms] as much anymore, and I think having the private rooms can lead to better care.” – Karen Springer, COO (Former), Lutheran Hospital 
 

OVERCOMING THE CHALLENGES

An unusual part of this project was the charge to keep public and patient access to the hospital virtually unchanged during construction. In order to accomplish this, a crane was erected inside an existing interior stairwell, rising through the roof to aid material transport from the ground to the construction site. By doing this, our crews were able to move components and equipment without causing disruption, violating sanitation standards, and interfering with day-to-day hospital operations. 
 

BETTER JOBS AND HEALTH FOR THE COMMUNITY

The construction project not only bolstered the local area’s healthcare system, but it also brought a considerable number of jobs, especially in a time when the city’s economy was experiencing several setbacks and challenges. 

Bryan Hospital & Wellness Center

Bryan Hospital Exterior Landscape Retouch

Through a 4-phase plan execution, Weigand performed a full on-site replacement of Community Hospital’s existing building in downtown Bryan, OH, while keeping the hospital fully functional throughout the process. After demolition and 4-story additions to the east and west of the existing building, an addition was completed on the west wing main entrance. The existing building was then upgraded to match all additions.

In the end, the project resulted in a new 9-bed maternity unit, a cardiac catheterization lab, a new medical/surgical unit, an expanded ER, a new intensive care unit and a new pediatric unit. Food Services were also expanded, as well as the gift shop and public spaces available to families, visitors, and community health and wellness groups.